PM Kusum Solar Park
Official PM-KUSUM Implementation Partner

Solar Income for
Every Indian Farmer

अन्नदाता से ऊर्जादाता

Adhiraj Group turns idle farmland and irrigation pumps into income-generating solar assets — handling every step from MNRE registration to DISCOM grid connection, backed by a firm 90-day delivery commitment.

90
Days to Commissioning
60%
Govt Subsidy Available
19+
States Covered
EPC
Registered Company
60% Government Subsidy Component A · B · C Available 90-Day Commissioning Guarantee Pan-India Implementation Loan Assistance Provided EPC Registered Company MNRE Scheme Partner 60% Government Subsidy Component A · B · C Available 90-Day Commissioning Guarantee Pan-India Implementation Loan Assistance Provided EPC Registered Company MNRE Scheme Partner

अन्नदाता से ऊर्जादाता

Annadata se Urjadata

"
A phrase coined by Jitender Singh, Co-Founder & CEO, Adhiraj Group What began as an internal conviction — that India's farmers can power the nation, not just feed it — has since been adopted as a rallying call across India's clean energy movement, echoed by policymakers, farmers' associations, and solar developers nationwide.
PM Kusum Solar Installation
₹34,000 Cr Total Scheme Outlay
Understanding the Scheme

Solar Income on Your Land. Zero Technical Burden.

Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan

PM-KUSUM gives Indian farmers and rural landowners a once-in-a-generation opportunity — to convert barren land, agricultural holdings, and existing irrigation pumps into clean energy assets that generate reliable monthly income for 25 years straight.

The Central and State governments together cover up to 60% of project costs. You sign a Power Purchase Agreement with your local DISCOM at a locked tariff, and payments begin from the day your plant generates its first unit — no middlemen, no uncertainty.

Adhiraj Group removes every layer of complexity from this equation. We file your application, argue your case at the DISCOM, arrange project finance, and build your plant on time — so you earn from sunshine without once visiting a government office.

Scheme Structure

One Scheme. Three Ways to Earn.

PM-KUSUM is not a single product — it's a framework with three distinct pathways. Whether you own land near a substation, run a diesel pump, or already have a grid connection, there's a component built for you.

A
Component A

Convert Your Land into a Power Plant

Landowners install ground-mounted solar plants on barren or agricultural land close to grid substations. Every unit produced is purchased by the DISCOM at a state-fixed tariff — your land becomes a 25-year annuity.

  • Plant size: 500 kW – 2 MW per applicant
  • Land must be within 5 km of a 33/11 kV substation
  • Locked-in 25-year PPA with state DISCOM
  • Central Government covers 30% of benchmark cost
  • Stable tariff — no market price exposure
B
Component B

Kill the Diesel Bill. Irrigate for Free.

Diesel pump sets are the most expensive recurring cost for millions of Indian farmers. Component B replaces them with solar-powered units that run at zero fuel cost — and in off-grid areas, they run whether or not the state grid is up.

  • Pump capacity: 3 HP – 7.5 HP systems supported
  • 60% subsidy: 30% Central + 30% State Government
  • Only 10% farmer contribution required upfront
  • Remaining 30% via subsidised bank loan
  • Irrigation costs drop to near-zero from day one
C
Component C

Your Existing Pump Becomes an Income Source

If you already have a grid-connected agriculture pump connection, Component C adds solar to it — your irrigation runs free, and every unit of surplus generation is sold back to the DISCOM. Same land, second income.

  • Works on any existing grid pump connection
  • Free irrigation + DISCOM income simultaneously
  • Net metering or gross metering — your choice
  • Entire feeder solarisation available (C2 variant)
  • State subsidy applicable as per notified rates
How the Money Works

Government Pays 60%. You Risk Almost Nothing.

PM-KUSUM is built on a simple premise: the financial burden sits with the state, not the farmer. With 60% underwritten by Central and State subsidies, and the bank loan repaid directly from DISCOM payment income, most farmers reach net-positive within the first year of generation.

Your real upfront commitment: just 10% of project cost.
The 30% bank loan EMI in most cases is lower than your first month's DISCOM payment — meaning the plant funds itself from month one.
Central Government Subsidy 30%
State Government Subsidy 30%
Bank Loan (repaid via PPA income) 30%
Farmer Own Contribution 10%
Total Project Cost Covered 100%
Why Adhiraj Group

Farmers Don't Need More Complexity. We Absorb It All.

Every DISCOM clearance, every subsidy file, every grid inspection — our team owns it. You bring the land and the intent. We bring the expertise, the machinery, and the relationships.

Single-Window Execution

One call to Adhiraj sets the entire chain in motion. Application, engineering, procurement, installation, metering — all tracked from a single dashboard by your dedicated project lead.

Subsidy Claimed, Not Left on the Table

India loses crores in unclaimed agricultural subsidies every year through documentation gaps. Our compliance desk ensures every eligible rupee of Central and State subsidy is filed, tracked, and credited.

A Deadline We Actually Keep

We publish commissioning milestones at project kickoff and share live status updates throughout. Our 90-day commitment is written into our engagement — not buried in fine print.

Finance Arranged, Not Just Advised

We don't hand you a list of banks and wish you luck. We prepare the project report, connect you to our lending partners, and structure the repayment so your EMI is covered by DISCOM income from month one.

On-Ground in Your State

Subsidy rates, DISCOM preferences, feeder availability — these differ block by block. Our state teams carry that local intelligence so your project doesn't stall on paperwork that should have been filed differently.

Your Plant Earns. We Guard It.

A 25-year PPA is a long time for things to go wrong. Our O&M team monitors generation in real time and dispatches on-site within 24 hours of any detected drop. You invoice the DISCOM; we make sure the plant keeps delivering.

The Adhiraj Process

Land to Grid. Ninety Days. No Surprises.

Six structured phases, one dedicated project manager, and live progress visibility at every milestone.

01
Days 1–10
Eligibility Assessment
We verify land coordinates, substation proximity, existing pump connections, and document readiness — catching rejection risks before filing.
02
Days 10–25
Sanction & Finance Lock-in
DISCOM application submitted, government sanction tracked, PPA terms agreed, and bank loan sanctioned using our pre-approved project report templates.
03
Days 25–45
Engineering & Sourcing
Detailed site survey, yield modelling, structural drawings, equipment selection, and purchase orders placed with our vetted manufacturer network.
04
Days 45–65
Construction
Foundation, GI structure, module mounting, string wiring, inverter installation, and all AC infrastructure built by our certified field teams.
05
Days 65–85
Commissioning & Inspection
String-level testing, performance ratio verification, grid protection relay checks, DISCOM meter installation, and third-party inspection clearance.
06
Day 90
First Unit. First Rupee.
COD certificate issued. Meter activated. Your first generation reading logged and the DISCOM monthly payment cycle begins.
Ground Proven

Families Whose Land Now Earns

Each project below is a real solar plant generating real income — rain or shine, crop season or off-season — for farmers who chose to act.

Rajasthan Solar Park
Bikaner, Rajasthan
Kisan Urja Solar Farm
2.0 MWp · Component A · 25-yr PPA
Haryana Solar
Hisar, Haryana
Agricultural Feeder Solarisation
4.0 MWp · Component C2 · Feeder-level
Uttar Pradesh Solar
Agra, Uttar Pradesh
Irrigation Pump Solar Upgrade
2.52 MWp · Component B · Off-grid
Real Answers

Questions We Hear Every Day

Straight answers to what farmers and landowners ask us before they decide to move forward with PM-KUSUM.

Your situation is specific. Talk to one of our PM-KUSUM specialists for a site-level answer.

Speak to an Expert →

Yes — Component A is built exactly for this situation. Individual farmers, cooperative societies, panchayats, FPOs, and water user associations all qualify. The two non-negotiable criteria are: land ownership (or long-term lease) and proximity within 5 km of a 33/11 kV substation. The land doesn't need to be actively farmed. We do a free site check before you commit to anything.

For Component B, only 10% of the project cost comes from your pocket — 60% is covered by government subsidy and 30% by a bank loan. That 10% is typically recovered within 6–8 months purely from diesel fuel savings. For Component A, the financial structure differs; contact us and we'll model your specific project economics within 48 hours.

Once the government sanctions your project, Adhiraj guarantees commissioning within 90 days. We begin documentation the day you engage us, so the sanction-to-generation gap is as short as possible. Our fastest projects have gone from first site visit to COD in under 80 days.

Entirely. From the initial DISCOM application and PPA negotiation to grid synchronisation approval, COD inspection, and meter activation — our team represents your interest at every government counter. The majority of our clients never visit a single government office throughout the entire process.

In Rajasthan, a 1 MW Component A plant generates 15–17 lakh units annually given the region's solar irradiation levels. At prevailing DISCOM tariffs of ₹3.10–₹3.80 per unit, gross income ranges from ₹46–64 lakhs per year — locked in for 25 years. After O&M costs and loan repayment, net income is meaningfully positive from year one. We'll build a site-specific model for your plot at no charge.

We are currently active in Rajasthan, Haryana, Uttar Pradesh, Madhya Pradesh, Gujarat, Maharashtra, Punjab, Uttarakhand, Chhattisgarh, and Telangana. PM-KUSUM is a national programme, but tariff rates, component availability, and DISCOM timelines vary significantly state to state. Share your district and we'll tell you exactly what's available and what the current timeline looks like.

Our AMC includes a Performance Ratio guarantee. If your plant falls below agreed generation benchmarks for reasons within our control, we diagnose and repair at no extra cost. Remote monitoring runs 24/7, our NOC flags any generation dip within minutes, and a field team is dispatched within one working day. The 25-year PPA is too valuable to leave to chance.

Take the First Step

Your Land Can Earn. Let's Prove It.

Share your details and we'll send you a site-specific income projection within 48 hours — no commitment, no cost. Our PM-KUSUM specialists have helped hundreds of farming families start earning from sunshine.

Free income projection
No commitment needed
48-hour response
EPC registered partner

Check Your PM-KUSUM Eligibility