अन्नदाता से ऊर्जादाता
Adhiraj Group turns idle farmland and irrigation pumps into income-generating solar assets — handling every step from MNRE registration to DISCOM grid connection, backed by a firm 90-day delivery commitment.
अन्नदाता से ऊर्जादाता
Annadata se Urjadata
PM-KUSUM gives Indian farmers and rural landowners a once-in-a-generation opportunity — to convert barren land, agricultural holdings, and existing irrigation pumps into clean energy assets that generate reliable monthly income for 25 years straight.
The Central and State governments together cover up to 60% of project costs. You sign a Power Purchase Agreement with your local DISCOM at a locked tariff, and payments begin from the day your plant generates its first unit — no middlemen, no uncertainty.
Adhiraj Group removes every layer of complexity from this equation. We file your application, argue your case at the DISCOM, arrange project finance, and build your plant on time — so you earn from sunshine without once visiting a government office.
PM-KUSUM is not a single product — it's a framework with three distinct pathways. Whether you own land near a substation, run a diesel pump, or already have a grid connection, there's a component built for you.
Landowners install ground-mounted solar plants on barren or agricultural land close to grid substations. Every unit produced is purchased by the DISCOM at a state-fixed tariff — your land becomes a 25-year annuity.
Diesel pump sets are the most expensive recurring cost for millions of Indian farmers. Component B replaces them with solar-powered units that run at zero fuel cost — and in off-grid areas, they run whether or not the state grid is up.
If you already have a grid-connected agriculture pump connection, Component C adds solar to it — your irrigation runs free, and every unit of surplus generation is sold back to the DISCOM. Same land, second income.
PM-KUSUM is built on a simple premise: the financial burden sits with the state, not the farmer. With 60% underwritten by Central and State subsidies, and the bank loan repaid directly from DISCOM payment income, most farmers reach net-positive within the first year of generation.
Every DISCOM clearance, every subsidy file, every grid inspection — our team owns it. You bring the land and the intent. We bring the expertise, the machinery, and the relationships.
One call to Adhiraj sets the entire chain in motion. Application, engineering, procurement, installation, metering — all tracked from a single dashboard by your dedicated project lead.
India loses crores in unclaimed agricultural subsidies every year through documentation gaps. Our compliance desk ensures every eligible rupee of Central and State subsidy is filed, tracked, and credited.
We publish commissioning milestones at project kickoff and share live status updates throughout. Our 90-day commitment is written into our engagement — not buried in fine print.
We don't hand you a list of banks and wish you luck. We prepare the project report, connect you to our lending partners, and structure the repayment so your EMI is covered by DISCOM income from month one.
Subsidy rates, DISCOM preferences, feeder availability — these differ block by block. Our state teams carry that local intelligence so your project doesn't stall on paperwork that should have been filed differently.
A 25-year PPA is a long time for things to go wrong. Our O&M team monitors generation in real time and dispatches on-site within 24 hours of any detected drop. You invoice the DISCOM; we make sure the plant keeps delivering.
Six structured phases, one dedicated project manager, and live progress visibility at every milestone.
Each project below is a real solar plant generating real income — rain or shine, crop season or off-season — for farmers who chose to act.
Yes — Component A is built exactly for this situation. Individual farmers, cooperative societies, panchayats, FPOs, and water user associations all qualify. The two non-negotiable criteria are: land ownership (or long-term lease) and proximity within 5 km of a 33/11 kV substation. The land doesn't need to be actively farmed. We do a free site check before you commit to anything.
For Component B, only 10% of the project cost comes from your pocket — 60% is covered by government subsidy and 30% by a bank loan. That 10% is typically recovered within 6–8 months purely from diesel fuel savings. For Component A, the financial structure differs; contact us and we'll model your specific project economics within 48 hours.
Once the government sanctions your project, Adhiraj guarantees commissioning within 90 days. We begin documentation the day you engage us, so the sanction-to-generation gap is as short as possible. Our fastest projects have gone from first site visit to COD in under 80 days.
Entirely. From the initial DISCOM application and PPA negotiation to grid synchronisation approval, COD inspection, and meter activation — our team represents your interest at every government counter. The majority of our clients never visit a single government office throughout the entire process.
In Rajasthan, a 1 MW Component A plant generates 15–17 lakh units annually given the region's solar irradiation levels. At prevailing DISCOM tariffs of ₹3.10–₹3.80 per unit, gross income ranges from ₹46–64 lakhs per year — locked in for 25 years. After O&M costs and loan repayment, net income is meaningfully positive from year one. We'll build a site-specific model for your plot at no charge.
We are currently active in Rajasthan, Haryana, Uttar Pradesh, Madhya Pradesh, Gujarat, Maharashtra, Punjab, Uttarakhand, Chhattisgarh, and Telangana. PM-KUSUM is a national programme, but tariff rates, component availability, and DISCOM timelines vary significantly state to state. Share your district and we'll tell you exactly what's available and what the current timeline looks like.
Our AMC includes a Performance Ratio guarantee. If your plant falls below agreed generation benchmarks for reasons within our control, we diagnose and repair at no extra cost. Remote monitoring runs 24/7, our NOC flags any generation dip within minutes, and a field team is dispatched within one working day. The 25-year PPA is too valuable to leave to chance.
Share your details and we'll send you a site-specific income projection within 48 hours — no commitment, no cost. Our PM-KUSUM specialists have helped hundreds of farming families start earning from sunshine.